House No. B982/18 Boame,Street North Kaneshie, Accra-Ghana
+233 (0) 30 222 4792 / +233 (0) 24 462 4328

Construction of 2.5m × 2.5m Storm Drain – Madina Estate

Construction of 2.5m × 2.5m Storm Drain – Madina Estate

Client: Private Infrastructure Development

Status: Completed

Duration: 3 months

Construction of a 2.5m × 2.5m storm drainage channel in Madina Estate to enhance stormwater management and reduce flooding.

Development of a 2.5m by 2.5m reinforced concrete storm drainage channel in Madina Estate designed to enhance stormwater management, reduce flooding risks, and improve drainage capacity within the residential community.

Construction of 2.5m × 2.5m Storm Drain – Madina Estate
24/7 Customer Support!
Benyark Engineering Co