Status: Completed
Duration: 3 months
Construction of a reinforced 2m × 2m storm drainage system at Circle, Accra to improve flood control and urban drainage.
Construction of a 2m by 2m reinforced concrete storm drainage system at Circle in Accra to improve flood control, manage stormwater runoff, and enhance urban infrastructure resilience in one of the city’s busiest commercial areas.